Illustrative Case Study · Manufacturing

Reducing Unplanned Downtime by 34% with Predictive Maintenance

A sample engagement showing how sensor telemetry and anomaly detection can cut unplanned stoppages across a multi-site manufacturer.

01
Challenge

Unplanned Stoppages Were Draining Output

A mid-sized manufacturer running nine plants saw repeated unplanned stoppages from bearing and motor failures that alarms flagged only after damage began.

Maintenance was calendar-based, so some assets were serviced too early while others failed between visits. Plant managers had no shared view of asset health across sites.

  • Alarms triggered after failure had started.
  • Calendar-based servicing wasted planned hours.
  • No consolidated asset health view across plants.
02
Solution

Edge Telemetry and Anomaly Detection

BEZENT designed a sensor mesh that streams vibration and temperature data to edge gateways, with models scoring each asset’s health in near real time.

Maintenance leads received ranked alerts with a likely cause and recommended window. A single dashboard showed asset health, open work orders and trends for every plant.

  • Edge gateways with local inference for low latency.
  • Health scoring with explainable alert reasons.
  • Work-order integration with the existing maintenance system.
03
Outcome

Measurable Gains in Reliability

Within two quarters the pilot plants saw unplanned downtime fall by about a third and maintenance hours shift from reactive to planned work.

The results below are illustrative figures for this sample case study.

  • 34% reduction in unplanned downtime at pilot sites.
  • 21% fewer emergency maintenance call-outs.
  • Rollout to remaining plants planned in phases.
FAQ

Frequently Asked Questions

Direct answers about engineering methodology, technical tradeoffs, and production implementation.

Ready to discuss your project requirements?

Start a Project →
Do you need to replace existing machines?

No. Sensors are retrofitted to existing assets, and gateways connect to current control and maintenance systems.

How long does a pilot take?

A focused pilot on a handful of critical assets typically takes ten to twelve weeks from kickoff to the first live alerts.

Is this a real client engagement?

This page is an illustrative example of the type of work BEZENT delivers; figures are representative, not client-confirmed.

Next Steps

Architect Your Solution with BEZENT

Consult directly with our solution architects to design systems engineered for your operational scale.